The same errors come back on the next project.
The markups, RFIs and defect logs exist, but nobody can find them when the next design starts.
AI design review for construction
Tektome’s AI turns your past projects into requirements and reviews every new design against them, before you build it.
Book a demoPAST PROJECTS
Riser too tight for valve access
Riser door clashes with pipework
Riser door could not open fully
Allow 600 mm in front of every riser
REQUIREMENTS CREATED
Riser clear width at least 600 mm, with full door swing
Riser doors open outwards, clear of pipework
Access zone shown on every riser plan
Your team approves each requirement before it is used in a review.
REVIEWED ON REV C
A-201 · LEVEL 3 · REV C
Riser 450 mm wide. Needs 600 mm.
Same problem as the Halden markup and Cornbrook RFI 042
3 requirements reviewed2 MET1 NOT MET
Requirements built from your past markups, RFIs, defects and lessons learned, then reviewed on the new design
The latest review at a glance: what passed, what failed and what is unsure, with the top failure cited to its source
Every requirement with its discipline, severity, cost to fix, status and source, in one register
Each requirement keeps its source, how it is verified and a dated history, so you can show what was reviewed and why
The problem
The markups, RFIs and defect logs exist, but nobody can find them when the next design starts.
No one can review every design against all of them, or keep them up to date after each review.
What each person has learned sits in their inbox, notes and memory, so the review is only as good as who is on the project.
What gets reviewed depends on who has time before the submission goes out.
Inaccurate, incomplete or late design affected 44.8% of the 1,800 projects in HKA’s CRUX dataset (6th annual report, 2023).
The solution
Ask for the review. Tektome runs it and shows the evidence.
Which past defects could repeat on this design?
REVIEWED 214 RECORDS FROM 6 PAST PROJECTS
Riser door could not open fully
Party wall gap not sealed at level 2
Compartment line missing at the plant deck
Defects, RFIs and snags from earlier projects that match this design, each linked to its original record
Can you turn our past markups into requirements?
READING 38 MARKUPS FROM HALDEN AND CORNBROOK
Riser too tight for valve access
REQ-118NEW
Riser clear width at least 600 mm
Doors kept clashing with pipework
REQ-119NEW
Riser doors open outwards, clear of pipework
14 requirements created from 38 markups6 AWAIT APPROVAL
Markups, meeting notes and lessons learned turned into requirements your team approves before any review
Does this package meet our design standard?
REVIEWED AGAINST DESIGN STANDARD V4 · 312 CLAUSES
256 met18 not met38 not yet reviewable
§12.3 Riser clear width
NOT MET · A-201§8.1 Door vision panels
MET§14.2 Plant access route
METWhere the package meets your standard and where it does not, each point cited to its clause and sheet
What is still open before we issue this package?
3 OPEN ITEMS BEFORE ISSUE
REQ-118 · Riser clear width
Compartment line at the plant deck
Acoustic test evidence, party wall type B
3 open of 312 requirements · issue planned for 4 Dec
The requirements still open before issue, who owns each one, and what evidence is missing
What changes
Measured inRework and remedial costs
Measured inRFIs, snagging and warranty claims
Measured inReview hours per submission
Measured inIssues that stop recurring across projects
Reads from the document systems your teams already work in. No migration, no parallel filing.
Who it’s for
Turn the comments your team keeps writing into a review your consultants cannot skip.
Design-and-build · fit-out · main contracting
For contractorsYour design standard, applied to every designer’s submission, and kept current with what each new site teaches you.
Data centres · logistics · hotels · student housing · life sciences · build-to-rent
For owner-operators & developersFind a house-type error once, and stop it on every site that builds it.
Standard house types · multi-site programmes
For housebuilders
Your project data stays yours, and it is never used to train shared models. On a pilot engagement, everything is deleted at close.
Trust & securityA 30-minute call about your projects and standards. Nothing to set up, no project data needed.
Then see it on your own projects: bring one design standard, and we show you what a review would catch.
Step 3 of 3
Thirty minutes, and you will get a calendar invite straight away.
A calendar invite is on its way to your inbox.
Henry will bring a prepared sample project, so there is nothing for you to set up.
Need to change it? Reply to the invite and we will sort it out.